2024Year
The Bristack®-Z series alkaline electrolyzers have been rolled off the production line

2023Year
The unveiling ceremony of the Hydrogen Energy R&D Center and the automated hydrogen energy production line was built

2023Year
Shanghai Carbon Expo. The 2,000 Nm³/h C-series alkaline electrolyzer and the 100 Nm³/h PEM electrolyzer have been completed and rolled off the production line

2022Year
The 1,500 Nm³/h C-series alkaline electrolyzer and the 50 Nm³/h PEM electrolyzer have been rolled off the production line